Request pilot access
Concrete · deepest coverage

Concrete tender briefs, referenced to the clause.

Every class, exposure, cover and mix limit in the concrete pack, referenced to its clause. Quantities and cross-checks are calculated from the pack's own figures, and gaps come back as drafted RFIs.

In every brief:

1

References you can check

Requirements link to their page or clause. Items with no source are flagged for review.

Table A, elements
ElementClassCoverSource
AGS Tanks base slabS5050/65DTM Table 5
Inlet Works base slabS4050/65DTM Table 5
HV Switchroom slabN3230/40DTM Table 6
2

Conflicts flagged

The drawings, the memo and the spec are often written by different engineers.

Table J, conflicts

Exposure class, AGS Tanks base slab

DTM Table 5B1
DWG 16100005B2

Both sources shown. Precedence not established: RFI to the designer before pricing

3

RFIs drafted

One question per RFI, for you to review before sending.

Table K, RFIs
5Confirm pile integrity (PDA) testing frequency and which party bears the cost.Commercial
6Confirm crack-mapping submission stage for special-class liquid-retaining tanks.Durability

Rows from the sample brief, built from an example pack with the same checks as a live read. Conflicts are left for you to resolve.

What you get

Concrete checklist

  • ✓ Element schedule: grade, cover, exposure classification, design life
  • ✓ Mix design limits: binder content, water-cement ratio, SCM and carbon caps
  • ✓ Cover schedule and the crack widths the pack sets
  • ✓ Pile schedule and indicative volumes
  • ✓ Hold points, witness points and ITP requirements
  • ✓ Document conflicts, ranked
  • ✓ Numbered draft RFIs to review before issue

Standards: AS 3600, AS 1379, AS 3972, AS/NZS 3582, AS 5100.5, AS 3735, AS 2159.

See the whole thing

The full concrete sample brief opens in a new tab. Six documents, Tables A to K, the conflict list and every drafted RFI. No sign-up needed.

Every pilot starts with a short call about your trade, pack size and deadline.

Beta

Review the waterproofing requirements in your tender.

Get a schedule of membrane systems, falls, upturns, set-downs, flood tests and warranty terms, with document references. Selected checks flag falls, floor build-up, missing details and unsuitable standard references. Gaps come back as drafted RFIs.

What you get

Waterproofing checklist

  • ✓ Membrane system & class by location, with its source
  • ✓ Falls to drainage. Flags anything below 1:100 external (AS 4654.2)
  • ✓ Below-ground using an above-ground standard (AS 4654), red flag
  • ✓ Upturn heights listed for review; set-down checked against screed + tile build-up
  • ✓ Flood-test duration and missing warranty details flagged for review
  • ✓ Standards currency, missing details, drafted RFIs

Selected checks reference AS 4654.1, AS 4654.2, AS 3740 and AS 4858. Review the source documents and applicable standards before relying on the brief. Tables A to D contain the schedule, checks and conflicts, RFI register, standards and notes.

See the whole thing
Concrete sample

A concrete brief showing the format

This example shows the layout of tables, source references, conflicts and drafted RFIs. Request pilot access to review waterproofing requirements.

Open the concrete sample
In development

Steel tenders. Coming soon.

Steel is the next trade in development. Steel tenders are mostly specification text and schedules. Join the waitlist for early access.

What you'll get

Steel checklist

  • ✓ Steel grades (AS/NZS 3679 sections, 3678 plate) per member group
  • ✓ Construction category CC1-CC4 and the inspection it triggers
  • ✓ Surface prep + coating system, DFT and durability class (AS/NZS 2312)
  • ✓ Fire rating (FRL) and fire-protection thickness
  • ✓ Connection-design responsibility (who designs, who certifies)
  • ✓ Weld categories (SP/GP), fastener grades (8.8/TB/TF), fabrication tolerances, ITP hold points

Standards: AS 4100, AS/NZS 5131, AS/NZS 2312, AS/NZS 1554.

Next: steel

Steel carries the most specification text after concrete. Tell us if you price steel and we'll prioritise it.

In development

Passive fire tenders. Coming soon.

Passive fire comes after steel. These tenders are mostly schedules and tables, which are slow to check by hand. Join the waitlist for early access.

What you'll get

Passive fire checklist

  • ✓ Required FRL per element / barrier (-/120/120 etc.)
  • ✓ Tested system numbers and the test report behind each (AS 1530.4)
  • ✓ Penetration & service types (cables, pipes, ducts) and the matching system
  • ✓ Construction joints and movement allowance
  • ✓ Substrate, product (collar / wrap / mortar / sealant) and DFT
  • ✓ Insulation vs integrity criteria; missing test evidence flagged as RFIs

Standards: AS 4072.1, AS 1530.4, NCC fire-protection provisions.

After steel: passive fire

Most of the pricing and compliance detail sits in schedules and tables.

Any trade · big packs made short

Your one-stop shop for tender packs.

Get a brief of the requirements for your scope, with document references, conflicts and draft RFIs. Use it to review the pack, prepare pricing or hand the requirements to a subcontractor.

Opens a sample brief in a new tab. No sign-up needed.

Your documents stay private. They are read by a paid AI service that doesn't train on them, deleted after the read unless you choose to keep them, and kept apart from other firms. How we handle documents

Three steps

  1. 1

    Choose your scope and role

    Builder, client, estimator or subcontractor: tell us what you need to check.

  2. 2

    Upload the pack

    PDF, Word and Excel. One file or the whole tender at once.

  3. 3

    Review and hand over

    Check the references and open questions. Download the brief as PDF or Markdown, or the Excel register.

In every brief:

1

References you can check

Requirements link to their page or clause. Items with no source are flagged for review.

Returnables
ItemRequiredSource
Priced schedule of ratesYesITT cl.11(a)
Quality plan & ITPsYesITT cl.11(c)
Public liability cover$20mITT cl.11(e)
2

Conflicts flagged

The contract conditions and the addenda are often written weeks apart.

Conflict between documents

Retention percentage

Contract conditions cl.95%
Addendum 210%

Both sources shown. Check the order-of-precedence clause: RFI before pricing

3

RFIs drafted

Anything the pack doesn't answer becomes a drafted question.

RFIs drafted
7Confirm whether off-site washout is covered under the base contract or priced separately.Commercial
8Hydraulic drainage layout referenced in the spec was not received with this pack. Please issue.Documents

Example rows showing the layout of a brief. A brief is not a quantity take-off or a compliance certificate, and conflicts are left for you to resolve.

What you get

Baseline checklist

  • ✓ Client, head contractor, delivery method and close date.
  • ✓ Full scope of works, and what is excluded or priced by others.
  • ✓ Provisional sums.
  • ✓ Contract form, retention and defects liability period.
  • ✓ Liquidated damages, the milestones they attach to, and insurances.
  • ✓ Site, environmental and work-hours constraints.
  • ✓ Every returnable needed for a conforming bid.
  • ✓ Standards register checked for currency.
  • ✓ A numbered draft RFI register to review before issue.
  • ✓ A watch-list of up to 20 items you name, each one found or raised as a question.

Any trade, at baseline depth. Concrete and waterproofing have their own deeper packs.

What a baseline brief returns

Two blocks from a baseline brief: the commercial terms, then the watch-list you named.

Commercial terms worth knowing before you price
Liquidated damages$8,500/day
Retention5%, 2.5% at PC
Contract formAS 4902-2000

Baseline depth is the first read for any pack. Trade engineering checks are in the deeper packs, and the brief tells you when one applies.

4 questions · one-page spec

Custom tender briefs.

Set out the scope and items you need to check. Use the summary in your pilot enquiry. This page does not read or upload tender documents.

Set the scope
Your brief spec
Fill in what applies and select Create my brief spec. This prepares your enquiry; no documents are read.
How it works

From tender pack to brief

Four steps in the web app. Nothing is read or charged until you've seen the cost.

1

Upload the pack

Add the whole tender at once: conditions, scope, specifications, schedules and drawings. PDF, Word and Excel. Macro-enabled files are not read. Scripts, links and attachments inside a document are never run or opened.

2

Choose the scope to review

Choose your trade, what the brief should focus on, and anything specific to look for. Only the parts that matter to that trade are read and charged.

3

See the cost, then confirm

SpecBrief sizes the pack and shows the exact credits before the AI reads a page. Cancel and nothing is charged.

4

Get your brief

Every requirement is referenced to its document and clause, conflicts are flagged and gaps come back as drafted RFIs. Unread pages are listed. Download a PDF, Excel or Markdown copy.

New to SpecBrief? Request pilot access and we'll set up your account and help with your first pack. Please don't email tender documents.

Data & confidentiality

How we handle your documents

Tender packs are often confidential. We read them through a paid business AI service, with contract terms that limit how it can use your data.

Not used for training

We don't train models on your documents, and our AI provider's paid terms don't let it use them to improve its products. If that can't be confirmed, uploads stop until it is. See the privacy notice.

Deleted by default

Files are deleted once the brief is built. The brief itself is kept for 30 days, then deleted. Download the PDF or Excel copy to keep it longer.

Separate for each firm

Each firm's packs and briefs are kept separate in the database. No other firm can open them. Two-factor sign-in is available.

Where data goes

The AI provider receives the text of your documents and, for PDFs, the pages as images. It may keep prompts and responses for a limited time for safety and legal reasons, and may process them in any country.

The Privacy & Data Handling notice names our AI provider, where data is processed and how long it's kept. The Security page lists every provider and region.

Pilot pricing

Buy credits when you need them

One-off credit packs, shared across your firm. No subscription, automatic top-ups or expiry.

Trial

A$20 / once

1 credit · once per firm

Use the credit towards a read. You see the exact charge before confirming. One credit can cover more than one smaller read.

Request pilot access

10 credits

A$190 / pack

A$19 per credit

Buy another pack whenever you need it.

Request pilot access

20 credits

A$340 / pack

A$17 per credit

One balance shared across your firm.

Request pilot access
Lowest price per credit

50 credits

A$690 / pack

A$13.80 per credit

For firms that tender often.

Request pilot access

Prices in AUD, no GST. Get in touch to set up your account.

Credits are based on the relevant text and pages in your pack. A read uses 0.50 credits or more, and you see the exact charge before it starts (API reads follow the Terms). For a large pack we show which documents cost the most, so you can leave some out. You're not charged for a read that fails.

Unused packs can be refunded within 30 days. Refund terms

Method

How the numbers work

How each figure is produced, and what a brief can't see.

AI reads, code calculates

The AI model extracts what the documents say, including stated figures. Code performs the calculations. Check the inputs and results against your pack before relying on them.

Unread pages are listed

The brief lists scanned pages, drawings that wouldn't open and documents referred to but not supplied.

Quotes are checked

Numbers in a concrete brief are matched to the page they reference. Items you ask for must quote the documents exactly, and each shows the passage it came from.

A register you can work from

Download the RFIs as a numbered Excel register with columns for sent to, date, response and status, plus every requirement and conflict with its source.

Get started

Request pilot access

Tell us your role, the scope you need to review, roughly how big your packs are and when the tender closes. Please don't send tender documents through this form or by email.

SpecBrief Pty Ltd is an Australian company. We reply to every enquiry ourselves.

Please don't attach tender documents. We use these details only to reply, as set out in our privacy notice.

Sample brief Request pilot access